From: route@monster.com
Sent: Friday, August 19, 2016 10:53 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: Scheduler
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Jose Aguirre 1521 Rosenbaum Ln. El Paso, Texas 79912 Phone: 915-301-3737 joeelpaso@aol.com WORK
EXPERIENCE: Ultimate Concrete El Paso, TX Project Scheduler June 2015 to July 2016 ·
Created bid, baselines, & update schedule Using
Primavera P6 version 8.4 ·
Created CPM baseline schedule; created the WBS, activities,
activity codes, & logic ·
Worked with subcontractor and vendors to verify activity
durations & timeframe for long lead items ·
Cost loaded project schedules and created pay applications ·
Created accruals to estimate monthly earning at end of
each month ·
Performed Earned value analysis ·
Tracked project cost and progress on the monthly narrative
report ·
Attended monthly schedule update meetings to review
updated cost, schedule logic changes, correction of out of sequence work, and
production rates ·
Uploaded schedule information into QCS/RMS for USACE
projects ·
Performed QCS/RMS support to include creating Prompt
Payment Certifications, track stored materials, submittals, and running
reports ·
Analyzed claim data to include verification of dates,
time, production rates, equipment usage, costs, and impacts to the project
schedule Tradeco InfrastructureEl Paso,
TX Sr. Scheduling Manager February 2015 to June 2015 ·
Scheduled demolition, concrete/asphalt paving, bridge
construction, & all Utilities ·
Created CPM baseline schedule using Primavera P6 version
8.4; created WBS structure, added work activities, activity coding, &
schedule logic ·
Cost loaded CPM schedule and developed Cost Curves
(S-Curves) for monthly projections ·
Supported 4 heavy civil TXDOT projects located in Houston
& Beaumont, Texas McCarthyFt. Bliss, TX Project Scheduler August 2014 to February 2015 ·
Reviewed and revised the CPM schedule logic on a 13,500
activity schedule ·
Scheduled vertical construction as well as infrastructure
work ·
Created 2 week & 180 day look ahead for use with
subcontractor and USACE weekly meetings ·
Created & submitted pay applications, submittal
tracking sheets, material logs, and invoice backups ·
Attended meetings with subcontractor and USACE to discuss
schedule and logic adjustments ·
Uploaded schedule into QCS/RMS to create the Prompt
Payment Certification ·
Developed work flows and analyzed schedule data ·
Created Fragnets using Primavera P6 using the reflection
function and merged the reflection schedule into master schedule after USACE
approval of contract modifications ·
Provided training and support to Project Managers, Project
Engineer on using Primavera P6 to include saving layouts, filters, adding and
deleting activities, & logic adjustments Sundt Construction El Paso, TX & Phoenix, AZ Scheduling Engineer/Project Engineer February
2012 to August 2014 ·
Worked as a scheduling Engineer scheduling in the Heavy
Civil Division scheduling demolition, utility installation, Electrical
Substations, roadway widening, Bridge paving, PCCP, Rail installation, &
Rail Stations ·
Developed the Primavera P6 CPM master schedule from plans
and specification, subcontractor’s schedules, and 3rd party
utility providers work schedules ·
Created the WBS codes, activity codes, activity id’s,
activity descriptions, and added all items specified in the Project Contract
specifications ·
Verified field quantities from 3rd party
utility providers, subcontractors, and self-performed work and updated the
actual start dates, finish dates, remaining durations, and activity percent
complete ·
Cost loaded the Primavera (P6) Schedule and used it as a
Schedule of Values to create the monthly pay application submitted to the
owner ·
Attended meetings to determine the status of submittals,
procurement of long lead items, right of way acquisitions, and traffic
control constraints ·
Attended cost review meetings to compare actual weekly
cost with earned value ·
Ran and analyzed S-Curves from Primavera (P6) &
MS-Excel to compare actual monthly cost with monthly projected cost (early
and late curve) ·
Calculated all reimbursable cost, construction fee, and
home office overhead to bill to the owner ·
Submitted monthly Schedule update using Primavera (P6) Jacobs Engineering Group/USACE Fort Bliss, TX Project Controls Scheduler May 2008 to February 2012 ·
Reviewed and analyzed over 400 CPM baseline/update
schedules to include HQ, COF, TEMF, DFAC, Physical Fitness Center, Child
Development Centers, Landscape & Infrastructure, POV & GOV parking,
UEPH, MP/Fire Station, Water Booster Pump Station, and medical facilities ·
Analyzed Contractor’s Network Analysis System (NAS)
schedules in Primavera Project Planner (P3) and Primavera Project Manager
(P6) and recommend acceptance/rejection ·
Assisted Contractors in importing the schedule (SDEF
files) into QCS/RMS ·
Imported Primavera (P3) schedules into Primavera Project
Manager (P6) ·
Created reports with Primavera (P3/P6) and MS-Excel
Spreadsheets to determine cost percent complete by project, phase, area,
responsibility, and WBS ·
Created earning reports to determine the cost percent
complete ·
Analyzed contract modification using Fragnets, RFI’s,
claim digger, & Digger 3.0 ·
Update the Primavera (P6) master schedule STC ConstructorsEl Paso, TX Quality Control Manager/Scheduler December 2007 to
May 2008 ·
Created CPM schedules for the Centralized Vehicle Wash
Facility and the Air Support Operations Squadron in Ft. Bliss, Texas using
Primavera (P3) ·
Submitted daily Quality Control Reports to the United
States Army Corps of Engineers ·
Worked with the USACE Quality Control System software
(QCS) to import the Project Schedule, Quality Control Reports, submittals,
and pay applications ·
Estimated concrete work, dry and wet utilities, and
earthwork ·
Verified all submittals & shop drawings before
submitting to (USACE) ·
Ensured that materials for the job were delivered on time
and met the Buy American Act ·
Compared actual material and budgeted hours to the master
budget ·
Reviewed bid packages from subcontracts and vendors before
awarding contracts ·
Developed field progress photos and daily logs of actual
work progress Baker ConcreteAvondale, AZ Project Engineer October 2007 to November 2007 ·
Estimated concrete SOG, spread/strip footings, tilt wall
panels, piers, sidewalks, masonry footings, stamped concrete, CIP walls,
material quotes, and request for information (RFI’s) ·
Submitted concrete mix designs, shop drawings, and
Reinforcing steel specifications ·
Modified the estimate to match the actual material,
budgeted hours, and profit ·
Reviewed subcontracts and bid packages to submit to
clients and vendors ·
Assisted in the creation of purchase orders and material
buyouts ·
Updated the schedule using MS-Project Agave Environmental Contracting Glendale, AZ Project
Manager August 2006 to September 2007 ·
Reviewed contracts, schedules, bids, submittals, and
as-builts ·
Estimated irrigation system, plants, boulders, and
concrete for change orders ·
Compared actual material pricing to estimate and performed
material buyouts ·
Created project job books with budgets, contracts,
bluestakes, and purchase orders ·
Processed RFI’s, permits, invoices, purchase orders, and
change orders ·
Attended weekly production meetings with Superintendent to
review schedules and field operations ·
Attended weekly owner’s meeting to discuss status of
RFI’s, submittals, and schedule updates ·
Reviewed cost using Timberline Software to compare actual
cost verses budgeted cost per bid item and identified cost overruns and
problem areas StoneCrafters of Arizona Phoenix, AZ Estimator
December 2005 to August 2006 ·
Estimated stone veneer from Plans/Blue prints using a
ruler and digitizer · Entered
data into MS-Excel Spreadsheet to find material, labor, and profit totals · Reviewed
Scope of work, Contract documents, and design specifications ·
Submitted bid documentation and proposals to clients ·
Worked with MS-Access database to query material prices
& inventory levels Electronic Data Systems El Paso, TX Information AssociateJanuary 2005 to November 2005 ·
Developed C code and UNIX scripts in a Sun Solaris/Oracle
9i environment to create reports and load data, & to transfer data from
client’s Database to backup Database ·
Created SQL and PL/SQL statements in Oracle 9i ·
Created unit test plans, implemented designs into
production, and verified code ·
Environment: Sun Solaris, Oracle 9i, & UNIX operating
system AG Construction El Paso, TX Project Engineer January 1991 to November 2004 · Worked on
various projects ranging from new construction to remodeling · Tracked
cost and compared budgeted quantities, actual quantities and cost · Conducted
field supervision to include laborers, sub-contractors, and vendors · Scheduled
materials orders and deliveries · Approved
invoices from vendors and subcontractors · Entered
material, labor hours, and cost into MS-Access and Excel spreadsheet · Administered
RFI’s, change orders, permits, shop drawings, submittals, and as-builts EDUCATION: University of Texas at El PasoEl Paso, Texas Bachelor of Business
Administration
December 2003 Computer Information Systems Certification: Primavera (P3) 601, 602 & 603 Houston,
Texas Innovative Management Solutions January 2008 Certification: Primavera Project Manager (P6)Ft. Bliss, Texas Innovative Management Solutions November 2010 Certificate: 30 Hour OSHATempe,
Arizona Sundt ConstructionSeptember 2013 SKILLS
& ABILITIES · Strong
computer skills with Microsoft Office (Excel, Word, PowerPoint, Access,
Outlook) · Experience
with JD Edwards & Prolog · Expert in
Primavera P3, Primavera P6, & Microsoft Project · Certifications:
Primavera (P3) 601-Planning and Scheduling, Advanced Courses 602 & 603 · Certifications:
Primavera Project Manager (P6) · Certificate:
Critical Path Method I & II, 30 Hour OSHA · Member:
Project Management Institute (PMI), AACE, & CMAA |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
Spanish |
Fluent |
|
|
|